Watch the Launch

Additional Media

Liberty Bell 7 - Full Mission

The full launch and flight of Mercury-Redstone 4 (Liberty Bell 7) with astronaut Gus Grissom aboard. July 21st 1961. I have used some original braodcast vide...

Mercury-Redstone 4

Circle Image

Overview

Destination: Suborbital
Mission: Human Exploration

Suborbital Launch Complex 5 Cape Canaveral SFS, FL, USA

Mercury-Redstone 4 was the second United States human spaceflight, on July 21, 1961. The suborbital Project Mercury flight was launched with a Mercury-Redstone Launch Vehicle, MRLV-8. The spacecraft, Mercury capsule #11, was nicknamed the Liberty Bell 7, and it was piloted by the astronaut Virgil "Gus" Grissom.

Redstone

Family:
Configuration: MRLV

The Mercury-Redstone Launch Vehicle, designed for NASA's Project Mercury, was the first American manned space booster. It was used for six sub-orbital Mercury flights from 1960–61; culminating with the launch of the first, and 11 weeks later, the second American (and the second and third humans) in space. The four subsequent Mercury human spaceflights used the more powerful Atlas booster to enter low Earth orbit. A member of the Redstone rocket family, it was derived from the U.S. Army's Redstone ballistic missile and the first stage of the related Jupiter-C launch vehicle; but to human-rate it, the structure and systems were modified to improve safety and reliability.

Specifications
  • Stages
    1
  • Length
    25.41 m
  • Diameter
    1.78 m
  • Fairing Diameter
    1.78 m
  • Launch Mass
    30.0 T
  • Thrust
Family
  • Name
    Redstone
  • Family
  • Variant
    MRLV
  • Alias
  • Full Name
    Redstone MRLV
Payload Capacity
  • Launch Cost
  • Low Earth Orbit
  • Geostationary Transfer Orbit
  • Direct Geostationary
  • Sun-Synchronous Capacity

Mercury No.11


In-active Human Rated Crew On-board: 1 Crew Capacity: 1
Destination: Suborbital
Serial Number: 11

Mercury No.11 is the Mercury capsule used for the Mercury-Redstone 4 - callsign "Liberty Bell 7" - mission launched on July 21, 1961 and piloted by astronaut Virgil "Gus" Grissom.

Mercury Details

Crew


Gus Grissom

Pilot - configurations.Country.None - ( NASA )

Status: Lost In Training

Date of Birth: April 3, 1926
Date of Death: Jan. 27, 1967

Chrysler

Chrysler

(CHR)

Founded: 1950 Successes: 0 Failures: 0 Pending: 0

Agency Type:

In July 1959, NASA chose the Redstone missile as the basis for the Mercury-Redstone Launch Vehicle to be used for suborbital test flights of the Project Mercury spacecraft. Three unmanned MRLV launch attempts were made between November 1960 and March 1961, two of which were successful. The MRLV successfully launched the chimpanzee Ham, and astronauts Alan Shepard and Gus Grissom on three suborbital flights in January, May and July 1961, respectively.

INFO WIKI

Cape Canaveral SFS, FL, USA

Launch Complex 5


Falcon 9
Success
2 days, 2 hours ago
Crew-11
Launch Complex 39A - Kennedy Space Center, FL, USA

SpaceX Crew-11 is the eleventh crewed operational flight of a Crew Dragon spacecraft to the International Space Station as part of NASA's Commercial …


Falcon 9
Success
2 days, 23 hours ago
Starlink Group 13-4
Space Launch Complex 4E - Vandenberg SFB, CA, USA

A batch of 19 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Kuaizhou
Success
3 days, 16 hours ago
PRSC-S1
Mobile Launcher Pad - Xichang Satellite Launch Center, People's Republic of China

Chinese built Earth observation satellite for Pakistan’s SUPARCO (Space & Upper Atmosphere Research Commission).


GSLV Mk II
Success
4 days, 6 hours ago
NISAR (NASA-ISRO Synthetic Aperture Radar)
Satish Dhawan Space Centre Second Launch Pad - Satish Dhawan Space Centre, India

The NASA-ISRO Synthetic Aperture Radar, or NISAR satellite, will use advanced radar imaging to map the elevation of Earth's land and ice masses 4 to …


Long March 8A
Success
4 days, 10 hours ago
SatNet LEO Group 06
Commercial LC-1 - Wenchang Space Launch Site, People's Republic of China

A batch of 9 Low Earth Orbit communication satellites for the Chinese state owned SatNet constellation operated by the China Satellite Network Group.…


Falcon 9
Success
4 days, 14 hours ago
Starlink Group 10-29
Space Launch Complex 40 - Cape Canaveral SFS, FL, USA

A batch of 28 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Eris-1
Failure
4 days, 19 hours ago
Maiden Flight
Eris Pad - Bowen Orbital Spaceport

Maiden flight of Gilmour Space's orbital launch vehicle Eris.


Hyperbola-1
Success
5 days, 14 hours ago
Kunpeng-03
Launch Area 95A - Jiuquan Satellite Launch Center, People's Republic of China

Commercial Earth observation satellite in SSO with sub-meter resolution capability.


Long March 6A
Success
1 week ago
SatNet LEO Group 05
Launch Complex 9A - Taiyuan Satellite Launch Center, People's Republic of China

A batch of 5 Low Earth Orbit communication satellites for the Chinese state owned SatNet constellation operated by the China Satellite Network Group.…


Falcon 9
Success
1 week ago
Starlink Group 17-2
Space Launch Complex 4E - Vandenberg SFB, CA, USA

A batch of 24 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.